Quality Assurance Checklist

Video file: ______________________ Book: __________ Editor: ___________________ Date: __________ Campaign ID: ______________________


Gate A — Accuracy

CheckYesNoCriticalNotes
Correct title and author☐☐✓
Correct cover (official file)☐☐✓
Faithful representation of the book☐☐✓
Every factual claim traceable to source☐☐✓
No accidental spoilers☐☐✓
No invented reviews/credentials/awards/stats☐☐✓
No invented bestseller status☐☐✓
No fabricated quotations☐☐✓
Approved promotional details present☐☐✓
Approved destination links present☐☐✓
Spoiler restrictions respected☐☐✓
Claim restrictions respected☐☐✓
Character depiction restrictions respected☐☐✓
Price/dates verified current☐☐✓

Gate A result: PASS ☐ / FAIL ☐ If FAIL, list critical accuracy defects:

1. 2. 3.


Gate B — Creative Quality

CheckYesNoCriticalNotes
Strong opening frame (0–0.5s)☐☐
Clear audience identified☐☐
Compelling hook☐☐
Coherent narrative structure☐☐
Appropriate pacing☐☐
Consistent visual style☐☐
Purposeful B-roll (no decoration)☐☐
Satisfying payoff☐☐
Clear CTA☐☐
Matches storyboard☐☐

Gate B result: PASS ☐ / FAIL ☐ If FAIL, list creative defects:

1. 2. 3.


Gate C — Technical Quality

CheckYesNoCriticalNotes
Correct 9:16 aspect ratio (1080×1920)☐☐✓
No black bars or distortion☐☐✓
Captions readable (size, contrast)☐☐✓
No clipping or overlapping text☐☐✓
No conspicuous AI artifacts☐☐
Captions on screen long enough to read☐☐✓
Clean transitions (no decorative effects)☐☐
Balanced audio (VO/Music/SFX)☐☐✓
No music competing with narration☐☐
Opening frame works silent☐☐✓
Correct export format for platform☐☐✓
No unintended watermark☐☐✓

Gate C result: PASS ☐ / FAIL ☐ If FAIL, list technical defects:

1. 2. 3.


Gate D — Delivery

CheckYesNoCriticalNotes
Correct filename☐☐✓
Correct output location☐☐✓
Project file/source preserved☐☐
Final export present and playable☐☐✓
Captions file included☐☐
Thumbnail included (if required)☐☐
Platform-specific versions included☐☐
Reviewer comments resolved☐☐
Approval status documented☐☐✓
Complete playback review done☐☐✓

Gate D result: PASS ☐ / FAIL ☐ If FAIL, list delivery defects:

1. 2. 3.


Final Verdict

All four gates pass: YES ☐ / NO ☐

Critical defects remaining: None ☐ / See above ☐

Resubmission required: YES ☐ / NO ☐

15-Video Batch Release Gate

Use explicit statuses only: PENDING, FAILED, CORRECTION_REQUIRED, or PASSED.

Video ID1. Source2. Scene count3. 10s duration4. VO 10s5. Relevance6. Voice7. Cover8. Branding/artifacts9. No hallucination10. Export watched11. Correction notes12. QA approvalFinal status
V01PENDING
V02PENDING
V03PENDING
V04PENDING
V05PENDING
V06PENDING
V07PENDING
V08PENDING
V09PENDING
V10PENDING
V11PENDING
V12PENDING
V13PENDING
V14PENDING
V15PENDING

Status Definitions

  • PENDING �?" not yet reviewed.
  • FAILED �?" reviewed and failed at least one check.
  • CORRECTION_REQUIRED �?" defect identified and correction assigned.
  • PASSED �?" all 12 checks passed and human QA approval recorded.

Rule: A failed or unchecked video must never be represented as author-ready.

Reviewer: _____________ Date: ______